FCC Secured & Trusted Communications Network Reimbursement Program (STCNRP)

Program level Payment Integrity results

Sponsoring agency: Federal Communications Commission

View on Federal Program Inventory

PROGRAM METRICS

$415 M

in FY 2026 outlays, with a

99.9%

payment accuracy rate

  • Improper payment estimates over time
    View as:

    Chart toggle amounts:
    Proper payments
    Overpayment
    Underpayment
    Technically improper
    Unknown

Payment Integrity results

  • FY 2026 improper payment estimates

    Chart legend and breakdown

    Payment accuracy rate

    Improper payment rate

    Unknown payment rate


    Sampling & estimation methodology details

    Sampling timeframe:

    10/2024 - 09/2025


    Confidence interval:

    90% to <95%


    Margin of error:

    +/-0.36

Causes

There was only one improper payment identified in the selected sample for the Secured & Trusted Communications Network Reimbursement Program (STCNRP). This invoice was a duplicate payment for equipment that was transferred and used at a different location. It was then expensed again as part of a second, standalone invoice.

Although the error was corrected, the FCC understands that the statutory requirements of the program were not met. There is a credit memo associated with the initial invoice for item total equal to the reimbursable amount of the second, standalone invoice.

Overpayment root cause Overpayment amount
Amount of overpayments within the agency's control $0.52 M
Amount of overpayments outside the agency's control $0.0 M
Amount of overpayments that occurred because the data/information needed to validate payment accuracy prior to making a payment does not exist $0.0 M
Amount of overpayments that occurred because of an inability to access the data/information needed to validate payment accuracy prior to making a payment $0.52 M
Amount of overpayments that occurred because of a failure to access data/information needed to validate payment accuracy prior to making a payment $0.0 M

Underpayment root cause Underpayment amount
Amount of underpayments $0.0 M

The amount of improper payments that were paid to the right recipient for the correct amount but were considered technically improper because of failure to follow statute or regulation $0.0 M

The amount that could either be proper or improper but the agency is unable to determine whether it was proper or improper as a result of insufficient or lack of documentation $0.0 M

Prevention

The improper payment was self-reported by the entity and corrected through a credit memo. The FCC also flagged the entity for enhanced monitoring to ensure this situation does not happen again.
The FCC issued a credit memo to address the duplicative payment. In addition, the entity was placed on enhanced monitoring. All STCNRP recipients will also have a site visit to confirm requirements are met prior to closeout.

The most impactful corrective actions are focused on enhanced monitoring and a site visit prior to closeout. The FCC will review the root cause of the error and continue to work with all recipients through closeout.

Payment type Mitigation strategies taken Mitigation strategies planned
Overpayments Audit, Change Process Audit

Eligibility element/information needed Description of the eligbility element/information
Financial The financial position or status of a beneficiary, recipient, or their family

Additional information

Reduction target

0.1 %

STCNRP has the internal controls, human capital, information systems, and other infrastructure it requires to reduce improper payments to targeted levels. The FCC and will continue to expand internal controls as necessary and will develop the human capital to ensure it meets its goals.

The STCNRP team did not identify additional resources needed to improve the overall structure of the program in its most current budget submission. The FCC and continues to work to determine the gaps in its overall requirements.

The STCNRP team has made strides in ensuring all employees involved in the program understand its requirements through the Methods and Procedures Guide. This guide has all the processes and controls for assessing program submissions. In addition, there is enhanced monitoring, to include, a final site review prior to closeout for all recipients. All improper payments are deemed collectible, and the team has either recovered or is in the process of recovering the improper payments.

$0 M