National Aeronautics and Space Administration

The NASA Office of Inspector General (OIG), in its FY 2025 review of NASA’s compliance with the Payment Integrity Information Act (Report IG-26-009), concluded that NASA complied with PIIA requirements. This finding provides assurance that NASA’s payment integrity processes and controls operate in accordance with applicable federal requirements.

NASA conducted its FY 2026 Payment Integrity Risk Assessment in accordance with OMB Circular A-123, Appendix C, Requirements for Payment Integrity Improvement. NASA annually updates its risk assessment methodology to reflect changes in federal laws and guidance, the Agency’s operating environment, external audit recommendations, and other relevant factors. For FY 2026, NASA’s methodology incorporated seven risk conditions aligned with the eleven OMB-designated risk factors. Consistent with OMB guidance (M-21-19), programs with annual outlays exceeding $10 million are classified as either Phase 1 or Phase 2 based on their likelihood of exceeding the statutory threshold for improper and unknown payments. NASA currently has no Phase 2 programs.

For the FY 2026 assessment, NASA reviewed $27.25 billion in FY 2025 disbursements and identified 82 programs with annual outlays exceeding $10 million. As part of the Agency’s triennial full assessment cycle, NASA conducted risk assessments for all 82 programs, regardless of whether they were assessed in the prior two years. In off-cycle years, NASA assesses newly identified programs that exceed the $10 million threshold, as well as existing programs with significant changes that may warrant an off-cycle assessment. None of the programs were found to be susceptible to significant improper payments. NASA maintains payment integrity through strong internal controls including both preventative controls (e.g., payment approval processes) and detective controls (e.g., the continuous monitoring program).

Show full executive summary
  • National Aeronautics and Space Administration improper payment estimates over time
    View as:

    Chart toggle amounts:
    Proper payments
    Overpayment
    Underpayment
    Technically improper
    Unknown

Recovery information

View as:

Chart toggle amounts:
Overpayment amount identified for recapture
Overpayment amount recovered

Recovery of overpayments

Please note: Overpayment amounts recovered are reported in the year they were recovered, not the year they were identified. Therefore it is possible in some years to have a recovery rate greater than 100%.

Overpayment amount identified through recovery activities $10.16 M
Overpayment amount recovered through recovery activities $9.47 M
Recovery activities recovery rate 93.21 %

Why recovery audits are not cost effective in certain programs

Consistent with OMB Circular A-123, Appendix C, NASA has determined that formal recovery audits are not cost-effective and therefore does not include them in its Payment Integrity Improvement Program. NASA’s analysis determined that the anticipated costs of conducting recovery audits would exceed the expected recovery of improper payments.

As an alternative, NASA conducts an internal overpayment review to monitor its payment processes and evaluate the effectiveness of controls designed to prevent, detect, and recover improper payments. Annually, NASA reviews overpayments identified outside of formal recovery audits to assess the causes and amounts of improper payments and track related recoveries. The review covers both cost-type and fixed-price contracts and includes an Agency-wide data call to identify and report overpayments and collections.

Intentional monetary loss improper payments are more commonly referred to as financial fraud and are overpayments that occur on purpose. This agency reported $1.39M of confirmed fraud in this reporting cycle.

Supplemental Information

OMB requires agencies to report their use of Treasury’s Do Not Pay (DNP) service and evaluate whether it has reduced improper payments or awards in support of Executive Order 14249, Protecting America’s Bank Account Against Fraud, Waste, and Abuse. NASA is committed to maintaining payment integrity and complying with EO 14249 and the Payment Integrity Information Act of 2019 (PIIA). NASA has utilized DNP since FY 2014 to help identify and prevent improper payments. DNP matches NASA’s payment files against the Social Security Administration’s Death Master File to identify potential payments to deceased individuals. NASA conducts a daily review of DNP results.

Since the FY 2026 DNP onboarding initiative, Treasury screened 75,706 NASA payments totaling $11,236,466,171. NASA’s review, combined with DNP matching, identified no improper payments in FY 2026. Following completion of required DNP technical onboarding, NASA will expand its use of DNP in FY 2027 to consider available data sources and continue implementation of Phase II and Phase III requirements.

These efforts are supported by NASA’s strong internal controls, including preventive controls such as payment approval processes, detective controls, and continuous monitoring.

The Working System has reduced/prevented improper payments:

NASA has not identitied incorrect information in the Working System.

NASA was found compliant during the most recent PIIA compliance review.

Show full list of compliant programs Expand

Compliant programs:

  • 21st Century Space (796W)
  • Advanced Air Vehicles Program
  • Advanced Exploration Systems
  • Aeronautics CoF (671L)
  • Aerosciences Evaluation and Test Capabilities
  • Agency Management (618I)
  • Agency Technical Authority
  • Airspace Operations and Safety Program
  • Applied Sciences
  • Astrophysics Explorer
  • Astrophysics Research
  • Biological and Physical Sciences
  • Catalyst (782D)
  • Center Management (361N)
  • Challenger Center (644W)
  • Commercial Crew Program
  • Commercial LEO Development
  • Communication Services Program
  • Congressional Medal (750R)
  • Cosmic Origins
  • Crew and Cargo Program
  • Discovery
  • Early Stage Innovation and Partnerships
  • Earth Science Data Systems
  • Earth Science Research
  • Earth Science Technology
  • Earth System Science Pathfinder
  • Earth Systematic Missions
  • Earth Systems Explorers (939L)
  • Enhanced Use Lease (014P)
  • Enhanced Use Lease Program
  • Environmental Compliance and Restoration
  • Exoplanet Exploration
  • Exploration CoF
  • Exploration Ground Systems
  • Exploration Opps (515N)
  • Exploration Tech Development Program (ETDP) (020U)
  • Foundational Capabilities (581L)
  • Future Systems
  • G&D Countdown Clock (633J)
  • Gateway
  • Heliophysics Explorer Program
  • Heliophysics Research
  • Heliophysics Technology
  • Human Landing System
  • Human Research Program
  • Human Research Program (317V)
  • Human Space Flight Operations
  • In-Space Infrastructure (147X)
  • Information Technology (IT)
  • Infrastructure & Technical Capabilities
  • Innovative Partnerships (714A)
  • Inspector General
  • Institutional CoF
  • Institutions and Management
  • Integrated Aviation Systems Program
  • International Space Station
  • Launch Services
  • Living with a Star
  • Lunar Discovery and Exploration
  • Mars Exploration
  • Mars Sample Return
  • Mission Enabling Services
  • Mission MOD Projects (748J)
  • National Historic Preservation
  • New Frontiers
  • Orion Program
  • Outer Planets and Ocean Worlds
  • Physics of the Cosmos
  • Planetary Defense
  • Planetary Science Research
  • RMB-ARMD Programmatic Reimbursables
  • RMB-ESMD Programmatic Program
  • RMB-OIG Institution (171G)
  • RMB-Reim Space Tech Programmatic Program (446T)
  • RMB-SCMD Institution (276D)
  • RMB-SCMD Programmatic Program
  • RMB-SOMD Inst Program (014L)
  • RMB-SOMD Institution (409C)
  • RMB-SOMD Programmatic Program
  • RMB-SSMS Institution
  • RMB-SSMS Programmatic (322G)
  • RMB-STEM Programmatic (976E)
  • RMB‑ESMD Institution (706Q)
  • Radioisotope Power
  • Responsive Science Initiative (RSI)
  • Rocket Propulsion Test
  • SBIR and STTR
  • STEM Engagement
  • Safety Engineering, Safety, & Operations
  • Safety Mission (512F)
  • Science CoF
  • Solar Terrestrial Probes
  • Space Communications and Navigation
  • Space Launch System
  • Space Operations CoF
  • Space Shuttle Program (538E)
  • Space Transportation (848W)
  • Space Weather
  • Space to Surface Access (873G)
  • Strategy and Architecture (191C)
  • Surface Infrastructure & Expl Cap (703Q)
  • Technology Demonstration
  • Technology Maturation
  • Transformative Aero Concepts Program
  • xEVA and Human Surface Mobility Program

Program name When was the last improper payment risk assessment conducted? Likely to be susceptible to significant improper payments? Substantial changes made to the assessment methodology used for the reporting cycle
21st Century Space (796W) *
Advanced Air Vehicles Program 2026 No No
Advanced Exploration Systems 2026 No No
Aeronautics CoF (671L) *
Aerosciences Evaluation and Test Capabilities 2026 No No
Agency Management (618I) *
Agency Technical Authority 2026 No No
Airspace Operations and Safety Program 2026 No No
Applied Sciences 2026 No No
Astrophysics Explorer 2026 No No
Astrophysics Research 2026 No No
Biological and Physical Sciences 2026 No No
Catalyst (782D) 2026 No No
Center Management (361N) *
Challenger Center (644W) *
Commercial Crew Program 2026 No No
Commercial LEO Development 2026 No No
Communication Services Program 2026 No No
Congressional Medal (750R) *
Cosmic Origins 2026 No No
Crew and Cargo Program 2026 No No
Discovery 2026 No No
Early Stage Innovation and Partnerships 2026 No No
Earth Science Data Systems 2026 No No
Earth Science Research 2026 No No
Earth Science Technology 2026 No No
Earth System Science Pathfinder 2026 No No
Earth Systematic Missions 2026 No No
Earth Systems Explorers (939L) 2026 No No
Enhanced Use Lease (014P) *
Enhanced Use Lease Program 2026 No No
Environmental Compliance and Restoration 2026 No No
Exoplanet Exploration 2026 No No
Exploration CoF 2026 No No
Exploration Ground Systems 2026 No No
Exploration Opps (515N) *
Exploration Tech Development Program (ETDP) (020U) *
Foundational Capabilities (581L) *
Future Systems 2026 No No
G&D Countdown Clock (633J) *
Gateway 2026 No No
Heliophysics Explorer Program 2026 No No
Heliophysics Research 2026 No No
Heliophysics Technology 2026 No No
Human Landing System 2026 No No
Human Research Program 2026 No No
Human Research Program (317V) *
Human Space Flight Operations 2026 No No
In-Space Infrastructure (147X) 2026 No No
Information Technology (IT) 2026 No No
Infrastructure & Technical Capabilities 2026 No No
Innovative Partnerships (714A) *
Inspector General 2026 No No
Institutional CoF 2026 No No
Institutions and Management 2026 No No
Integrated Aviation Systems Program 2026 No No
International Space Station 2026 No No
Launch Services 2026 No No
Living with a Star 2026 No No
Lunar Discovery and Exploration 2026 No No
Mars Exploration 2026 No No
Mars Sample Return 2026 No No
Mission Enabling Services 2026 No No
Mission MOD Projects (748J) *
National Historic Preservation 2026 No No
New Frontiers 2026 No No
Orion Program 2026 No No
Outer Planets and Ocean Worlds 2026 No No
Physics of the Cosmos 2026 No No
Planetary Defense 2026 No No
Planetary Science Research 2026 No No
RMB-ARMD Programmatic Reimbursables 2026 No No
RMB-ESMD Programmatic Program 2026 No No
RMB-OIG Institution (171G) *
RMB-Reim Space Tech Programmatic Program (446T) 2026 No No
RMB-SCMD Institution (276D) *
RMB-SCMD Programmatic Program 2026 No No
RMB-SOMD Inst Program (014L) *
RMB-SOMD Institution (409C) *
RMB-SOMD Programmatic Program 2026 No No
RMB-SSMS Institution 2026 No No
RMB-SSMS Programmatic (322G) *
RMB-STEM Programmatic (976E) *
RMB‑ESMD Institution (706Q) *
Radioisotope Power 2026 No No
Responsive Science Initiative (RSI) 2026 No No
Rocket Propulsion Test 2026 No No
SBIR and STTR 2026 No No
STEM Engagement 2026 No No
Safety Engineering, Safety, & Operations 2026 No No
Safety Mission (512F) *
Science CoF 2026 No No
Solar Terrestrial Probes 2026 No No
Space Communications and Navigation 2026 No No
Space Launch System 2026 No No
Space Operations CoF 2026 No No
Space Shuttle Program (538E) *
Space Transportation (848W) 2026 No No
Space Weather 2026 No No
Space to Surface Access (873G) 2026 No No
Strategy and Architecture (191C) 2026 No No
Surface Infrastructure & Expl Cap (703Q) *
Technology Demonstration 2026 No No
Technology Maturation 2026 No No
Transformative Aero Concepts Program 2026 No No
xEVA and Human Surface Mobility Program 2026 No No

* Assessment year is not displayed because one or more of the following statements is true:

  1. Not required to conduct a risk assessment under the Payment Integrity Information Act of 2019,
  2. Already assessed for improper payment risk under a different name in a prior reporting period, and/or
  3. New and planning to perform a risk assessment in the future.